bathroom remodel take 2: the 3 years later edition

It’s been a little over 3 and a half years since we took our first stab at remodeling our basic and bland main bathroom. In that project (some pictures), we took out the ugly tiles and put in beautiful natural slate tiles, and added a new vanity and mirror. This project went well, but was labor intensive. However, it was never meant to be the end; we always wanted to redo the shower, and put in a custom tiled shower with glass doors.

Well, the time has come to finish our spa bathroom. I can’t tell you how excited I am about this project. I HATE the pre-fab shower stalls that we have in both of our bathrooms, and I have wanted a walk in shower with the luxury of glass tiles and an upgraded shower nozzle. I also can’t wait to have glass doors; that will undoubtedly only make our bathing experience that much better.

So the construction will kick back into high gear over the next couple of weeks (I’m hoping it won’t take weeks, though); as God as my witness, we will finish this bathroom!! Here are stock photos of the tile we are planning to use:
For the walls, we want to use this beautiful aqua glass tile:

and for the floor, we want to use this gorgeous pebble tile; which according to the design shows, is all the rage:

Needless to say, there will be stories about the process as we begin demolition later this week, and definitely expect lots of pictures. I am VERY excited, because if it looks anything like the image I have in my mind, our bathroom is going to be AMAZING. Stay tuned for more.

13 comments for “bathroom remodel take 2: the 3 years later edition

Leave a Reply

Your email address will not be published. Required fields are marked *